Projects

We present our portfolio by stage of maturity, without aggregation. A project under development is not a built project, and we do not present it as one. Our supply assignments, being of a different nature, are shown separately and enter no capacity total.

Portfolio position

0 MW

In operation

No operating assets to date

0 MW

In construction

No works commenced

250 MWdc

In early-stage development

One project - Ntui solar power plant

Early-stage development - pre-feasibility complete

Ntui Solar Photovoltaic Power Plant

250 MWdc installed, 200 MWac injected, with battery storage - Centre Region, Cameroon

A utility-scale solar project developed under a public-private partnership with the Conseil Régional du Centre, in consortium with TES Technologies SARL, our strategic and technical partner in Cameroon.

Read the project page

Satellite view of the Earth centred on Central Africa with Ntui, Cameroon pinned, beside a map of Cameroon showing the Centre Region, the Sanaga river and Ntui about 66 kilometres north of Yaoundé.
Ntui, Centre Region, Cameroon - about 66 km north of Yaoundé on the Sanaga. Globe: NASA Blue Marble satellite imagery; boundaries and rivers: Natural Earth (public domain).
Project characteristics
LocationNtui municipality, Mbam-et-Kim division, Centre Region, Cameroon
Injected capacity200 MWac at the connection point - reading to be confirmed in the connection agreement
Installed capacity250 MWdc of modules, a direct-to-alternating current ratio of 1.25
Storage60 MW / 120 MWh, two hours of discharge - supporting the evening peak and system stability

Supply and sourcing assignments

Sourcing equipment for infrastructure projects falls under the related operations provided for in our articles of association. These assignments generate no electrical capacity, and so appear in none of the figures above.

Supply under way - procurement phase

Security equipment for the new BEAC headquarters

Bank of Central African States - national directorate headquarters building for Cameroon, Yaoundé

WB Synergy is responsible for sourcing, purchasing and moving from Europe the security equipment for the new BEAC headquarters building in Yaoundé. The order is held by TYROS for Trading & Contracting Cameroun SARL, under the electrical and technology lot awarded to TES Technologies SARL, our technical partner in Cameroon.

Read the project page

Assignment at a glance
Final destinationBEAC national directorate headquarters building for Cameroon, Yaoundé
Contracting partyTYROS for Trading & Contracting Cameroun SARL, the buying entity for the lot
Partner in CameroonTES Technologies SARL, holder of the electrical and technology lot
WB Synergy's roleSourcing, purchasing, European consolidation and export preparation

Our maturity ladder

We publish the criteria for moving from one stage to the next, so that a stated status can be checked rather than taken on trust.

WB Synergy project maturity ladder Diagram: WB Synergy's project maturity ladder. The Ntui solar project is at the early-stage development rung. The portfolio holds no megawatts in operation and none in construction. Ntui - 250 MWdc Identifiedopportunity Plausible technically andfinancially; possible site;no exclusivity secured Early-stagedevelopment Consortium formed andagreement signed;site identified; preliminarystudies; land not secured Advanceddevelopment Land secured; feasibilityand ESIA under way;PPA and tariffunder negotiation Readyto build Permits obtained;PPA signed; land and gridaccess guaranteed;financial close reached Underconstruction Notice to proceedissued to theEPC contractor Inoperation Acceptance signed;asset transferredto operations 0 MW In operation No operating assets to date 0 MW In construction No works commenced 250 MWdc In early-stage development One project - Ntui solar power plant Three figures stated separately - they are not additive.
0 MW in operation, 0 MW in construction, 250 MWdc in early-stage development: three separate figures, never summed. The stages and their criteria are set out in full in the table below. Interim working diagram.
We publish the criteria for moving from one stage to the next, so that a stated status can be checked rather than taken on trust.
Stage Criteria
Identified opportunity Technically and financially plausible; a site possibility exists; grid connection is conceivable. No exclusivity secured.
Early-stage development
← Our current energy project
Consortium formed and agreement signed; site identified; preliminary resource and grid studies under way; engagement opened with offtaker and authority. Land not yet secured.
Advanced development Land secured; grid-connection approval likely; feasibility study and ESIA under way or complete; power purchase agreement and tariff under negotiation.
Ready to build Permits obtained; power purchase agreement signed; land and grid access guaranteed; financial close reached or imminent.
Under construction Notice to proceed issued to the EPC contractor.
In operation Acceptance signed; asset transferred to operations.

Certain advisory engagements are covered by confidentiality undertakings and are not named on this site. Client references are provided on request, with the prior agreement of the clients concerned.